Detour (from goal)
Monday, September 20, 2004 by simpleblob
Originally, I designed my goal with an initial assumption that "Everything I do will contribute directly to my goal." In other words, I will choose to do the only things that the goal has setted.
Not possible.
This time, project crops up by itself -- my friend has asked me to write a program for him. I owes him a lot, so I can't turn down his request.
Unfortunately it is a very difficult project.
The difficult largely lies in how much time and energy I have left after work. I can say that I don't have much left...
To do this project on time, I must sacrified some or all of my free time. Hopefully this doesn't effect this blog.
enough rant, enough learnt for today, simpleblob::out.
Not possible.
This time, project crops up by itself -- my friend has asked me to write a program for him. I owes him a lot, so I can't turn down his request.
Unfortunately it is a very difficult project.
The difficult largely lies in how much time and energy I have left after work. I can say that I don't have much left...
To do this project on time, I must sacrified some or all of my free time. Hopefully this doesn't effect this blog.
enough rant, enough learnt for today, simpleblob::out.